A professional will attach your shade sail to your roof at the soffit under the lower structural edge where it is safe.
How to attach the shield to the roof.
The best way is to install the roof drip edge only along the eaves first then place ice and water barrier in the snowbelt or felt paper underlayment over the drip edge.
Poly shield is made of cellofoam expanded polystyrene eps rigid insulation faced with a tough poly laminate or a reflective foil facer.
Attach the horizontal beam by using a nail gun.
Push the pipe through it to the outside of the house.
Install roof drip edge along the eaves add underlayment then place drip edge along the gable end.
Poly shield s closed cell eps core wraps the structure in permanent r value retarding radiant heat flow and reducing air infiltration.
Using 2 5 or 3 5 wide zincshield install by butting the zinc strip against the ridge vent roof cap or the top most row of shingles at the roof ridge.
Heat tape metal roofs.
Heat cable ul listed to prevent ice dams.
The highest quality sealant goes for about 10 for a canister at home depot.
I am thinking about gluing the heat shield back on to the underside with blacktop roof sealant.
You can also support your shade sail with freestanding poles that are not in direct contact with the house.
Working on a roof can be dangerous so use caution.
Poly shield offers both high efficiency and low cost insulation.
It s a much better idea to attach a shade sail to your other backyard structures such as your gazebo or trellis.
Fit a fire stop into the joist shield and attach it to the ceiling joist.
After that to make it flush with the roof of the existing house cut the two outer rafters.
If possible it is best to slide about 1 4 under the roof ridge vent roof cap or the top row of shingles.
Use a nail to hold the shingle in place.
Cut another square opening through the roof.
Insert the pipe into the chimney outdoor enclosure.
You have to do it thoroughly so that the rafters sit flush on it.
I am thinking if it is strong enough to attach r.
Unique heat tape cable systems for the roof valley and the roof flashing on metal roofs.
Fold the copper back over so it s exposed to the weather and extend it up to about an inch or two above where the cap shingles will overlap it.
The bottom edge of the copper strip can fold underneath the last full shingle placed on the roof.
The heat shield ripped around the studs and it is just dangling under the car and making rattling noises.