It s very important to make sure that you grab the z channel that s below and make sure that you re in the outside leg of the z channel.
How to apply metal flashing roof.
Drip edge metal valley flashing dormer chimney and kick out flashing shed water away from the connections between roofs walls chimneys and other building assemblies this collection of 18 articles animations and videos identifies the critical roof flashing areas illustrates durable roof flashing details and shows how to flash roofs.
By the end of step 7 every square inch of the roof should be covered in metal the entire perimeter protected with edge flashing and all the roof joints protected with flashing.
While some skylight manufacturers include flashing in their products sometimes roofing professionals have to create it or purchase it separately.
Galvanized metal or aluminum is considered the best to use for roof flashing.
Roof flashing is a material used as a protectant against water leaks or seepage and is typically made of galvanized metal but it can also be in the form of aluminum sheet metal copper or even plastic.
Open valleys have metal flashing to protect this critical area of the roof.
Most flashing is made of galvanized metal but diy ers may prefer aluminum flashing because it s easier to bend.
If there are gutters installed on the eaves the eave flashing should be installed to overhang the lip of the gutter by about 1 2 inch.
The edge of the roof has thin metal flashing that helps water drip off the roof without damaging the home or causing a leak.
I m going to install one between each panel directly in the center.
4 inches should go up the house wall and 4 inches should go on top of the porch roof shingles.
These problem areas include the edges of skylights and chimneys soil stacks vent fans and roof valleys as well as the intersection of the roof deck and dormer walls.
Place corner pieces where panels will meet bends at the edge of the roofing.
Flashing provides the extra protection these spots need.
With the end wall flashing in place i use stitch screws to attach it to the z trim and to the gable trim.
Still up on the roof your next step is to make sure that all the edges are smooth and finished and that all panels are fully secured to the roof.
Most flashing is 8 inches wide.
This should be used in valleys points where 2 sections less than 140 degrees meet and as end caps over the tops of 2 sides that meet.