Up from the roof edge.
How long to strip a roof.
Using double roman roof tiles.
While this is a.
1 average replacement time calculated as an approximate time in days for a professional roofing crew to remove old and install 35 40 squares of new roofing materials on simple gable or hip roof with up to 8 12 pitch.
All numbers in the chart were calculated based on standard installation and do not include any roof repair work.
If you have cracked boards or rotting wood tearing off the old roof makes it easy to spot.
3 feet vertically and horizontally.
Replacement rotten wood rafters reinforcement installation.
This is just the basics on how to re roof a main roof.
Just to reiterate working on a roof is dangerous so be sure to take these precautions.
Wear shoes with soft rubber soles for a good grip and long pants to protect against the skin scraping shingles.
In colder weather i prefer spade shovels about 4 ft.
There s anecdotal evidence that new shingles installed over old shingles won t last as long as a single layered roof most manufacturers offer the same warranty for both methods.
This is great if you need a new roof immediately or if you don t have a lot of money to spend on lodging for the duration of the project.
Lay a strip of felt at the bottom of the roof and move towards the top of the roof with each new strip.
After you have removed all shingles from one side of the roof it is now necessary to walk the roof and remove any roofing nails that have been left behind.
When you remove the shingles from the roof you can see if your roof has any other issues that need attending to.
My dad and another guy once used this method to remove 84 sq.
If i remember correctly they cut the roof first even with the felt runs.
From an apartment job with all conditions ideal in one single day.
Won t last as long generally speaking the shingles that are laid over the old roof won t last as long as their natural lifetime due to extra heat trapped by the added layers.
Install the roofing felt.
Use a staple gun or hammer tacker to staple the felt to the roof.
Ensure that as you remove the shingles you are taking them from the roof and into the dumpster.
How long does it take to replace a roof.
How long does it take to replace a roof.
Lay strips of felt horizontally across the roof.
Layers of roofing shingles are often applied directly over the top of older roofing for the sake of economy and to save on time and labor.
Set roof jacks about 6 each and a 2x10 about 3 ft.
What is the best way to strip a roof.
Building codes say you can put a second layer of shingles over the first layer but it s better to strip off the old shingles and start with a clean slate.
Use a safety harness system to prevent falls.