A chalk line will need to be popped going down the middle of the roof from the bottom to the top.
How do you prepare a roof for 3 tab installation.
Before you begin make sure you re comfortable measuring laying out a job driving nails and cutting with a knife.
With one or two helpers you ll be able to shingle a 1 500 square foot roof in about two days.
Because the bending can stress and deform shingles especially in cold weather the ends of those shingles may warp over time creating a prominent pattern on the roof.
In all use four nails per 3 tab shingle.
Architectural shingles are another option and are installed the same way as 3 tab shingles but give your roof more of a 3 d effect due to their varied shapes.
Step four lay the start row of shingles.
To begin you will need to cut the tabs off of enough shingles so that you will be able to have an entire row of shingles that have no tabs across your roof.
Installing new shingles yourself can save considerable time and money and you can follow the same steps they do to achieve the same professional look.
Step three measure the roof line.
Pattern curling is caused by the roofer having to lift the end tab of every other shingle to install the last shingle nail at the end of the next shingle.
Roof installation how to shingle a valley hd by roofrepair101 more about roofing at.
Prep the roof by installing underlayment drip edge and valley flashing as needed.
Also place a nail 2 inches from each end of the shingle in line with the other two.
Step two prepare start row of shingles.
Measure your roof so you can be sure you buy the right amount of shingles.
3 remove old roofing and repair any damage start from the top of the roof and remove the old shingles along with the flashing underlayment and vents.
It generally takes three packs of shingles to cover 100 square feet 9 29 square meters.
However make sure that you do not nail into the tar strip.
You will then need to get your measuring tape out and measure the roof.
Mark a chalk line from the top to the bottom in the exact middle of the roof.
Take enough shingles to create one row across the roof of your house and then cut out the tabs of each of those shingles.
Step 2 prepare.
Place nails in the three tab shingles about 3 4 inch 1 8 centimeters above the cutouts near where the tab meets the upper part of the shingle.