When you reach the peak either bring the ridge edges together with a ridge capping layer or cut regular shingles into 3 tabbed equal pieces and bend them so they fit on the.
How do shingle the peak my roof.
Here s how to shingle the last row of a lean to roof.
Seal the top nail holes and continue on up with your shingles.
If you hit a stack vent or chimney interlace the shingles with the flashing to allow water to run down the roof.
Hammer a roofing nail on each side of the shingle five inches from the bottom edges and one inch from the side edge.
The shingles at the peak of your roof are commonly called cap shingles.
The cap shingles for most roofs measure 12 inches by 12 inches.
Overlap the shingles to cover the nails on the side edges and use roofing cement to cover the nail heads on the shingle at the end of the roof.
Install your shingles to the top edge of your lean to roof.
Cut and bend a shingle to conform to the shape of the peak of the roof.
Continue laying your shingles horizontally up the roof.
It s important to realize the amount of shingle exposed to the weather is only 5 inches.
It must be completed at the very end of the shingle run to overlap the uppermost shingles and form a.
Many pros shingle in a vertical line up the roof because it s much faster.
For a wood shingle roof you would have to cut the shingles that go on the edge to create a straight line to accommodate this.
Capping a roof is the last thing done during a roofing project.
Roof cap shingles overlap one another at the peak of a roof or along a hip where two slanting roofs meet on an outside corner of a house.
If your shingles are standard three tab shingles the caps are made by cutting one shingle into three separate parts.
Nail it down with your roofing gun top and bottom.
Ideally the top edge of the last shingle row is flush with the top edge.
The bottom row of shingles must hang past the edge of the roof.
Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps.
Trim the shingles with your utility knife photo 14.
If there is only a little space left then you re fine and don t have to lay another row yet.
If your roof s width is not an even multiple of the shingle s length you will have a partial piece on one end of each row.